WANT TO ORDER A BRAND-NEW ZEPHYR?
The Zephyr Owners' Association has developed a full fibreglass boat (hull and deck).
MACKAY NEW ZEPHYR PRICE LIST
All prices inclusive of GST
As at June 2022
STAGE ONE HULL
$12,700
Includes adjustable mast base, vang tang, chainplates, stem fitting, and venturies.
OPTIONAL EXTRAS FOR STAGE 1 HULL
- Custom Deck Colour - $300
- White, pastel green, pastel blue, pastel cream.
- Must be ordered prior to hull build.
- 3rd venturie in rear of cockpit - $300
- Stern Scuppers - $430
STAGE TWO HULL
$14,800
Includes adjustable mast base, vang tang, chainplates, stem fitting and venturies, all cleats fitted, robline ropes, bridle mainsheet.
OPTIONAL EXTRAS FOR STAGE 2 HULL
- Upgrade to twin car traveller system - $1020
- Custom deck colour - $300
- White, pastel green, pastel blue, pastel cream.
- Must be ordered prior to hull build.
- 3rd venturie in rear of cockpit - $300
- Stern scuppers - $430
EXTRA EQUIPMENT TO PURCHASE ALONGSIDE HULL
- Beach Trolley - $897
- Foils (XPL) - $3,500
READY TO SAIL ZEPHYR
Estimated cost of a ready-to-sail Zephyr is $25,000.
- Includes mast, boom, sail, all lines fitted, and beach trolley.
SELF FITOUT ZEPHYR
$22,000.
- You rig the mast and boom, fit cleats, gudgeons, and all lines.
DIFFERENT OPTIONS
Different options are available to meet the needs of different sailors!
Hulls can currently be bought to fit-out at home, or can be bought already fitted.
(A wooden deck option is not available with new Mackay GRP boats currently but if this is of interest, let us know so we understand future demand.)
ORDER A MACKAY ZEPHYR
If interested in purchasing, please contact Tony Miller (ZOA Treasurer) at tjmiller39@outlook.com
OCTOBER 2020 NEWS UPDATE:
The first weekend in October 2020 heralded two important events for the Zephyr class – the launch of the Mackay Boats full GRP prototype and the resumption of regatta racing.
A fibreglass Zephyr has been talked about for decades. The vision began life as a glass/wood project in 2015 and now 64 years since the first Zephyr appeared, a full-GRP example has finally arrived. During the COVID-19 Alert Level 4 lockdown, Brian Peet used the ‘at-home’ time to build the deck plug for Mackay Boats. Company owner Owen Mackay made similar use of his Level 3 then Level 2 time to construct the six moulds, then build the first hull.
The completed boat was launched at the French Bay on the morning of the Auckland Champs. The attention to detail and quality finish is a credit to Owen’s skill. Many have sailed the prototype, and all came away impressed. Four orders are in the pipeline.






